25.03.2016 INSTALLATION HOSE TOWER


Last week Herbosch-Kiere installed – in one piece - the prefabricated steel construction (‘Hose Tower’) on the new jetty of ITC RUBIS in the Port of Antwerp. This construction was prefabricated in the workshop of Herbosch-Kiere and was placed on the concrete platform of the jetty.

Dimensions of the steel construction: 22m (length) x 10m (width) x 14m (height), weight 120T.