JETTY - Construction of a jetty

Extension of a jetty for Rubis

Extension of the existing jetty that was built in 2009.

Piling works:

  • 169 steel foundation piles 
  • 27 steel piles for maritime constructions

Concrete works:

  • +-5000m³ concrete

Steel constructions:

  • 300m piperacks
  • hose tower on the main platform
  • a total of +/- 400T steel

Maritime constructions:

  • 5 guiding works and 17 mooring posts
  • 250m steel footbridges
Constructor(s): 
Herbosch-Kiere
Project duration: 
04/2015 - ...