Project

SOIL PROTECTION - BASF

Supply and placement of soil protection for jetties
 
  • Preparation and setting up profiles of the soil and slopes
  • Take bearings with multibeam system
  • Prefabrication of open stone asphalt mattresses
  • Placement of asphalt mattresses
  • Fill up the joints between the mattresses
  • Stone dumping around bollards on slopes
  • Reparation of a subsided slope
Constructor(s): 
Herbosch-Kiere - Roegiers