Project

SOIL PROTECTION - Gdansk

Placement of scour protection in Port of Gdansk DCT

Gdansk awarded Besix for the design and construction of a new berth and the adjacent container stacking yards in the Port of Gdansk. The new 650m long berth will increase DCT’s annual handling capacity up to 3 million TEU in the first stage of the construction. Besix asked Herbosch-Kiere to place scour protection by means of asphalt matresses of +/- 200 T. Our flatbed barge 'GAVERLAND' placed the matresses with our own designed lifting frame. Dimensions of the matresses are 30 x 11m and 30cm thickness.

Constructor(s): 
Herbosch-Kiere
Project duration: 
06/2016 - 07/2016