Dredging in Saint-Nazaire with Atlantis

Saint-Nazaire is France’s first offshore wind farm.

Together with ETMF , Herbosch-Kiere built France’s first offshore wind farm in Saint-Nazaire. We carried out the dredging operations in shallow water (draft 2.3 m) using our multifunctional vessel ATLANTIS.

Catch a glimpse of the works here.

  • Project name

    Dredging Atlantis
  • Location

    Saint-Nazaire, France
  • Building period

    2021
  • Total value

    +/- 2.3 M €