The Teesside wind farm is located 1.5 km off the coast of Redcar in the north-east of England.
The leg of a jack-up platform that was used during the construction of the wind farm became stuck in the soft mud on the seabed. Herbosch-Kiere was commissioned to excavate around the leg of the JB-114. Crane vessel ALBATROS was mobilised in order to carry out the excavation works in order to free the spud leg.