Drilling and probing operations at coastal ports

Herbosch-Kiere carried out trial boring operations in situ on the water from the OCTOPUS jack-up barge within three subzones: the Port of Ostend (Montgomery dock in connection with the realisation of flood prevention measures), Blankenberge (in connection with the construction of a western breakwater) and De Haan-Wenduine (in connection with the construction of one or more groynes).

  • Project name

    Drilling and probing operations at coastal ports
  • Location

    Ostend, Blankenberge, De Haan
  • Building period

    2019-2020
  • Total value

    +/- 2 M €