The contract consisted of the realisation of floating (ferry) jetties with steel access bridges, including the surrounding area.
The first ferry jetty consisted of fixed and floating access bridges, a floating bridge pontoon (50 m x 10 m x 2 m) and a guide structure consisting of 2 x 3 interconnected tubular piles (d 1422 mm x l 40 m X d 24 mm).
The second floating jetty for tug operators adjacent to the ferry jetty consisted of 8 floating side pontoons (20 m x 4.2 m x 2 m) and a guide structure consisting of 9 tubular piles (d 1880 mm x l 38.5 m x d 24 mm).