For the EPR2 project in Penly, France, Herbosch-Kiere is carrying out specialized rock placement works. These operations are crucial for the protection of the future nuclear power plant and the stability of the port infrastructure.
Our Atlantis plays a key role in this project. This work vessel is equipped with a lifting capacity of up to 400 tons and is used to place heavy stones on the seabed. Thanks to its versatility and robust design, we can work efficiently and safely, even under challenging conditions.
Through these rock placement operations, Herbosch-Kiere makes an important contribution to the maritime and civil works required for the successful realization of the Penly EPR2 project.