The Western HVDC Link is an offshore high-voltage direct current link in the United Kingdom which runs between Hunterston in West Scotland and Flintshire Bridge in North Wales and is routed to the west of the Isle of Man.
Herbosch-Kiere mobilised multifunctional vessel ATLANTIS to Liverpool in order to repair the offshore electrical cable on the instructions of the Prysmian Group. ATLANTIS was provided with a full onboard cable spread. The water was shallow where the cable lay which meant that the cable was exposed twice a day at low tide and also that the ATLANTIS was beached twice a day.