Zuiderveren Hoboken

This assignment involved the construction and installation of a new steel floating mooring pontoon on the Scheldt River in Hoboken. The existing floating pontoon was removed on site and replaced using specialized floating equipment.

The new pontoon was built as a durable steel structure, designed to withstand varying water levels and loads from shipping traffic. After transport over water, the pontoon was precisely positioned, anchored, and connected to the existing infrastructure.

  • Project name

    Zuiderveren Hoboken
  • Location

    Scheldt River in Hoboken
  • Building period

    2018-2020
  • Developer

    De Vlaamse Waterweg nv
  • Total value

    +/- €580k